Project Case Study – Clevedon Golf Club

Clevedon Golf Club Footpath to 1st Tee   Clevedon Golf Club required a pathway from the Car Park down alongside the clubhouse to the 1st Tee. The ground was becoming badly cut up with the heavy rainfall and they were experiencing wash down & migration of the current surface. We asked them to prepare a hard core base with edges… Read more »

Project Case Study – Field Shelter Bases

Mrs E Moody Field Shelter Bases South Widecombe A typical field shelter installation. Internal floor and surrounding area had been damaged by everyday use and problem compounded by wet weather. Entrance to shelter was soft and muddy rendering the access to the shelter difficult for the animals and virtually impossible for the owner.   Minimal… Read more »

Project Case Study – Cow Mattress Bed

Mr J Alvis Continuous Cow Mattress System Regilbury Park Farm   Ram-Track were asked to install approximately 100 cow cubicle beds at the Alvis’s Dairy Farm near Bristol Airport. Their previous mattresses had become compressed out of shape and channels between the beds had made it  difficult to clean – see opposite.     This photo shows… Read more »

Project Case Study – Cow Sand Bed

Mr W Parsons Deep Sand System Langford Green Farm   Our client was looking for an innovative & low cost solution for the base of his deep sand system. Previous problems with the bed have been the migration of loose aggregate up through the bed & high sand usage.     Our rubber crumb bonded with… Read more »